I got together with Jon and we updated this tired Ensuite, transforming it into a Wet Room. Firstly, I stripped out the old suite and tiles and created additional space by removing a hallway cupboard and blocking up the door aperture. The plasterboard on the walls and ceiling was replaced, floor strengthed for the Wet Room tray, and partition walls were strengthened for the wall hung basin and towel rail. The customer requested niches for bottles and a niche at low level for leg shaving (a first for us!) The shower area was boarded in Jackoboard and the whole area was extensively sealed using the Jackoboard Shower Sealing Kit.
The Ensuite Wet Room was plastered and expertly tiled before we second fixed the shower and the wall hung basin as well as fitting the back to wall toilet. The result is a stunning transformation and one that we, and the customer, are really proud of.